Limmatfeld Westhöfe, Dietikon

Année
2010
Maître d'ouvrage
Halter AG, Zürich
Architecte
Krischanitz ZT GmbH, Zürich

The group "West farms" with a company, a ground floor and six upper floors is divided into three residential wings and an office wing. The solid construction of prefabricated concrete columns, concrete and masonry walls and flat slabs in situ concrete is stiffened on the staircase cores and individual wall panels. The flat foundation rests on firm Limmat gravel, the basement is designed as a white sink, because it is partly in groundwater. The new building meets the requirements according to Minergie-Eco.

<< en arrière